Charging station Industrieterrein Kolmen 1107
Available connections
About this location
Looking for a charging station in Alken? At Industrieterrein Kolmen 1107 you'll find a public charging location with 32 available charge points. It's run by TotalEnergies. It's one of the 35 charging locations in Alken. Its power (120 kW) is above the local average of 25 kW.
- Postcode 3570 Alken
- Publicly accessible
- Connectors: CCS (2x), Type 2 (30x)
Other charging locations in Alken
Charging at Industrieterrein Kolmen 1107 in Alken
How long does charging take at Industrieterrein Kolmen 1107?
At 120 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 24 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.
What does charging cost at Industrieterrein Kolmen 1107?
TotalEnergies sets the price. On a fast charger in Belgium you pay 0.55 to 0.85 euros per kWh on average. For 36 kWh that comes to roughly 19.80 to 30.60 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.
Which plug does the charging station at Industrieterrein Kolmen 1107 have?
Here you charge with CCS, Type 2. CCS is a Type 2 plug with two extra pins for fast charging. Type 2 is the standard plug for AC charging in Europe.
How do I pay at this charging station?
With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.
Want to charge somewhere else nearby? See all charging stations in Alken.
Start route
Pick your navigation app and head straight there.
Estimate charging time
Work out how long you need to charge here
Location details
- Operator TotalEnergies
- Total chargers 32
- GPS 50.8847, 5.2992