Skip to main content
Standard~7.4 kW Publicly Accessible 2 charge points

Charging station Gentsesteenweg 1082

1082 Berchem-Sainte-Agathe (Sint-Agatha-Berchem)

Available connections

2x ~7.4 kW
Type 2
Normal 1-phase (Normal)
Loading map...

About this location

Looking for a charging station in Berchem-Sainte-Agathe? At Gentsesteenweg 1082 you'll find a public charging location with 2 available charge points. It's run by TotalEnergies. It's one of the 41 charging locations in Berchem-Sainte-Agathe. Its power (~7.4 kW) is below the local average of 12 kW.

  • Postcode 1082 Berchem-Sainte-Agathe
  • Publicly accessible
  • Connectors: Type 2 (2x)

Charging at Gentsesteenweg 1082 in Berchem-Sainte-Agathe

How long does charging take at Gentsesteenweg 1082?

At ~7.4 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 5 hours and 24 minutes. That's AC charging. Many cars take no more than 11 kW, even if the charger can deliver more. For your own car, work it out with the charging calculator.

What does charging cost at Gentsesteenweg 1082?

TotalEnergies sets the price. On a regular charging station in Belgium you pay 0.40 to 0.55 euros per kWh on average. For 36 kWh that comes to roughly 14.40 to 19.80 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Gentsesteenweg 1082 have?

Here you charge with Type 2. Type 2 is the standard plug for AC charging in Europe.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Berchem-Sainte-Agathe or the fast chargers in Belgium.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator TotalEnergies
  • Total chargers 2
  • GPS
    50.8716, 4.2901
Navigate now