Skip to main content
Fast120 kW Publicly Accessible 2 charge points

Charging station Koolmijnlaan 400

3580 Beringen

Available connections

2x 120 kW
CCS
Fast Fast charging (DC)
Loading map...

About this location

Looking for a charging station in Beringen? At Koolmijnlaan 400 you'll find a public charging location with 2 available charge points. It's run by Optiload. It's one of the 154 charging locations in Beringen. Its power (120 kW) is above the local average of 40 kW.

  • Postcode 3580 Beringen
  • Publicly accessible
  • Connectors: CCS (2x)

Charging at Koolmijnlaan 400 in Beringen

How long does charging take at Koolmijnlaan 400?

At 120 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 24 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Koolmijnlaan 400?

Optiload sets the price. On a fast charger in Belgium you pay 0.55 to 0.85 euros per kWh on average. For 36 kWh that comes to roughly 19.80 to 30.60 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Koolmijnlaan 400 have?

Here you charge with CCS. CCS is a Type 2 plug with two extra pins for fast charging.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Beringen.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator Optiload
  • Total chargers 2
  • GPS
    51.0799, 5.2190
Navigate now