Skip to main content
Standard41 kW Publicly Accessible 6 charge points

Charging station Jacques Morrensplein 2

2820 Bonheiden

Available connections

4x 19 kW
Type 2
Normal 3-phase (Fastest)
2x 41 kW
CCS
Normal Fast charging (DC)
Loading map...

About this location

Looking for a charging station in Bonheiden? At Jacques Morrensplein 2 you'll find a public charging location with 6 available charge points. It's run by Tap Electric. It's one of the 35 charging locations in Bonheiden. Its power (41 kW) is above the local average of 19 kW.

  • Postcode 2820 Bonheiden
  • Publicly accessible
  • Connectors: Type 2 (4x), CCS (2x)

Charging at Jacques Morrensplein 2 in Bonheiden

How long does charging take at Jacques Morrensplein 2?

At 41 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 59 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Jacques Morrensplein 2?

Tap Electric sets the price. On a fast charger in Belgium you pay 0.55 to 0.85 euros per kWh on average. For 36 kWh that comes to roughly 19.80 to 30.60 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Jacques Morrensplein 2 have?

Here you charge with Type 2, CCS. Type 2 is the standard plug for AC charging in Europe. CCS is a Type 2 plug with two extra pins for fast charging.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Bonheiden or the fast chargers in Belgium.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator Tap Electric
  • Total chargers 6
  • GPS
    51.0252, 4.5475
Navigate now