Charging station Morsheck 1
Available connections
About this location
Looking for a charging station in Büllingen? At Morsheck 1 you'll find a public charging location with 2 available charge points. It's run by novoeco | recharge (BayWa). It's one of the 8 charging locations in Büllingen. Its power (50 kW) is above the local average of 42 kW.
- Postcode 4760 Büllingen
- Publicly accessible
Other charging locations in Büllingen
Charging at Morsheck 1 in Büllingen
How long does charging take at Morsheck 1?
At 50 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 48 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.
What does charging cost at Morsheck 1?
novoeco | recharge (BayWa) sets the price. On a fast charger in Belgium you pay 0.55 to 0.85 euros per kWh on average. For 36 kWh that comes to roughly 19.80 to 30.60 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.
How do I pay at this charging station?
With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.
Want to charge somewhere else nearby? See all charging stations in Büllingen.
Start route
Pick your navigation app and head straight there.
Estimate charging time
Work out how long you need to charge here
Location details
- Operator novoeco | recharge (BayWa)
- Total chargers 2
- GPS 50.3975, 6.2377