Skip to main content
Standard230 kW Publicly Accessible 4 charge points

Charging station Steenweg naar Wetteren 24

9200 Dendermonde

Available connections

2x 22 kW
Type 2
Normal 3-phase (Fastest)
2x 230 kW
CCS
Ultra-fast Fast charging (DC)
Loading map...

About this location

Looking for a charging station in Dendermonde? At Steenweg naar Wetteren 24 you'll find a public charging location with 4 available charge points. It's run by Servolt. It's one of the 169 charging locations in Dendermonde. Its power (230 kW) is above the local average of 32 kW.

  • Postcode 9200 Dendermonde
  • Publicly accessible
  • Connectors: Type 2 (2x), CCS (2x)

Charging at Steenweg naar Wetteren 24 in Dendermonde

How long does charging take at Steenweg naar Wetteren 24?

At 230 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 16 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Steenweg naar Wetteren 24?

Servolt sets the price. On a ultra-fast charger in Belgium you pay 0.65 to 0.95 euros per kWh on average. For 36 kWh that comes to roughly 23.40 to 34.20 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Steenweg naar Wetteren 24 have?

Here you charge with Type 2, CCS. Type 2 is the standard plug for AC charging in Europe. CCS is a Type 2 plug with two extra pins for fast charging.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Dendermonde.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator Servolt
  • Total chargers 4
  • GPS
    51.0026, 4.0024
Navigate now