Skip to main content
Ultra-fast300 kW Publicly Accessible 2 charge points

Charging station Koning Leopoldlaan 2

9990 Maldegem

Available connections

2x 300 kW
CCS
Ultra-fast Fast charging (DC)
Loading map...

About this location

Looking for a charging station in Maldegem? At Koning Leopoldlaan 2 you'll find a public charging location with 2 available charge points. It's run by Powerland. It's one of the 104 charging locations in Maldegem. Its power (300 kW) is above the local average of 34 kW.

  • Postcode 9990 Maldegem
  • Publicly accessible
  • Connectors: CCS (2x)

Charging at Koning Leopoldlaan 2 in Maldegem

How long does charging take at Koning Leopoldlaan 2?

At 300 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 16 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Koning Leopoldlaan 2?

Powerland sets the price. On a ultra-fast charger in Belgium you pay 0.65 to 0.95 euros per kWh on average. For 36 kWh that comes to roughly 23.40 to 34.20 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Koning Leopoldlaan 2 have?

Here you charge with CCS. CCS is a Type 2 plug with two extra pins for fast charging.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Maldegem.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator Powerland
  • Total chargers 2
  • GPS
    51.2040, 3.4524
Navigate now