Skip to main content
Fast115 kW Publicly Accessible 24 charge points

Charging station Oude Gaversesteenweg 24b

9090 Merelbeke-Melle

Available connections

4x 115 kW
CCS
Fast Fast charging (DC)
20x 22 kW
Type 2
Normal 3-phase (Fastest)
Loading map...

About this location

Looking for a charging station in Merelbeke-Melle? At Oude Gaversesteenweg 24b you'll find a public charging location with 24 available charge points. It's run by Luminus Sub-MSP. It's one of the 162 charging locations in Merelbeke-Melle. Its power (115 kW) is above the local average of 37 kW.

  • Postcode 9090 Merelbeke-Melle
  • Publicly accessible
  • Connectors: CCS (4x), Type 2 (20x)

Charging at Oude Gaversesteenweg 24b in Merelbeke-Melle

How long does charging take at Oude Gaversesteenweg 24b?

At 115 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 24 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Oude Gaversesteenweg 24b?

Luminus Sub-MSP sets the price. On a fast charger in Belgium you pay 0.55 to 0.85 euros per kWh on average. For 36 kWh that comes to roughly 19.80 to 30.60 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Oude Gaversesteenweg 24b have?

Here you charge with CCS, Type 2. CCS is a Type 2 plug with two extra pins for fast charging. Type 2 is the standard plug for AC charging in Europe.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Merelbeke-Melle.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator Luminus Sub-MSP
  • Total chargers 24
  • GPS
    51.0063, 3.7488
Navigate now