Charging station Haute-Voie-de-Marche 19
Available connections
About this location
Looking for a charging station in Nassogne? At Haute-Voie-de-Marche 19 you'll find a public charging location with 1 available charge point. It's run by Monta. It's one of the 7 charging locations in Nassogne. Its power (7.4 kW) is below the local average of 21 kW.
- Postcode 6950 Nassogne
- Publicly accessible
Other charging locations in Nassogne
Charging at Haute-Voie-de-Marche 19 in Nassogne
How long does charging take at Haute-Voie-de-Marche 19?
At 7.4 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 5 hours and 24 minutes. That's AC charging. Many cars take no more than 11 kW, even if the charger can deliver more. For your own car, work it out with the charging calculator.
What does charging cost at Haute-Voie-de-Marche 19?
Monta sets the price. On a regular charging station in Belgium you pay 0.40 to 0.55 euros per kWh on average. For 36 kWh that comes to roughly 14.40 to 19.80 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.
How do I pay at this charging station?
With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.
Want to charge somewhere else nearby? See all charging stations in Nassogne or the fast chargers in Belgium.
Start route
Pick your navigation app and head straight there.
Estimate charging time
Work out how long you need to charge here
Location details
- Operator Monta
- Total chargers 1
- GPS 50.1354, 5.3479