Skip to main content
Standard150 kW Publicly Accessible 8 charge points

Charging station Gaston Roelandtsstraat 18

8020 Oostkamp

Available connections

4x 22 kW
Type 2
Normal 3-phase (Fastest)
4x 150 kW
CCS
Ultra-fast Fast charging (DC)
Loading map...

About this location

Looking for a charging station in Oostkamp? At Gaston Roelandtsstraat 18 you'll find a public charging location with 8 available charge points. It's run by Powerland. It's one of the 86 charging locations in Oostkamp. Its power (150 kW) is above the local average of 28 kW.

  • Postcode 8020 Oostkamp
  • Publicly accessible
  • Connectors: Type 2 (4x), CCS (4x)

Charging at Gaston Roelandtsstraat 18 in Oostkamp

How long does charging take at Gaston Roelandtsstraat 18?

At 150 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 16 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Gaston Roelandtsstraat 18?

Powerland sets the price. On a ultra-fast charger in Belgium you pay 0.65 to 0.95 euros per kWh on average. For 36 kWh that comes to roughly 23.40 to 34.20 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Gaston Roelandtsstraat 18 have?

Here you charge with Type 2, CCS. Type 2 is the standard plug for AC charging in Europe. CCS is a Type 2 plug with two extra pins for fast charging.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Oostkamp.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator Powerland
  • Total chargers 8
  • GPS
    51.1752, 3.2344
Navigate now