Skip to main content
Standard300 kW Publicly Accessible 15 charge points

Charging station Oostnieuwkerksesteenweg 136

8800 Roeselare

Available connections

12x 22 kW
Type 2
Normal 3-phase (Fastest)
1x 200 kW
CCS
Ultra-fast Fast charging (DC)
2x 300 kW
CCS
Ultra-fast Fast charging (DC)
Loading map...

About this location

Looking for a charging station in Roeselare? At Oostnieuwkerksesteenweg 136 you'll find a public charging location with 15 available charge points. It's run by Certipower. It's one of the 289 charging locations in Roeselare. Its power (300 kW) is above the local average of 34 kW.

  • Postcode 8800 Roeselare
  • Publicly accessible
  • Connectors: Type 2 (12x), CCS (3x)

Charging at Oostnieuwkerksesteenweg 136 in Roeselare

How long does charging take at Oostnieuwkerksesteenweg 136?

At 300 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 16 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Oostnieuwkerksesteenweg 136?

Certipower sets the price. On a ultra-fast charger in Belgium you pay 0.65 to 0.95 euros per kWh on average. For 36 kWh that comes to roughly 23.40 to 34.20 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Oostnieuwkerksesteenweg 136 have?

Here you charge with Type 2, CCS. Type 2 is the standard plug for AC charging in Europe. CCS is a Type 2 plug with two extra pins for fast charging.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Roeselare.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator Certipower
  • Total chargers 15
  • GPS
    50.9464, 3.0977
Navigate now