Skip to main content
Standard~11 kW Publicly Accessible 2 charge points

Charging station Georges Matheusstraat 6

1210 Saint-Josse-ten-Noode (Sint-Joost-ten-Node)

Available connections

2x ~11 kW
Type 2
Normal 3-phase (Fastest)
Loading map...

About this location

Looking for a charging station in Saint-Josse-ten-Noode? At Georges Matheusstraat 6 you'll find a public charging location with 2 available charge points. It's run by TotalEnergies. It's one of the 23 charging locations in Saint-Josse-ten-Noode. Its power (~11 kW) is above the local average of 9 kW.

  • Postcode 1210 Saint-Josse-ten-Noode
  • Publicly accessible
  • Connectors: Type 2 (2x)

Charging at Georges Matheusstraat 6 in Saint-Josse-ten-Noode

How long does charging take at Georges Matheusstraat 6?

At ~11 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 3 hours and 38 minutes. That's AC charging. Many cars take no more than 11 kW, even if the charger can deliver more. For your own car, work it out with the charging calculator.

What does charging cost at Georges Matheusstraat 6?

TotalEnergies sets the price. On a regular charging station in Belgium you pay 0.40 to 0.55 euros per kWh on average. For 36 kWh that comes to roughly 14.40 to 19.80 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Georges Matheusstraat 6 have?

Here you charge with Type 2. Type 2 is the standard plug for AC charging in Europe.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Saint-Josse-ten-Noode or the fast chargers in Belgium.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator TotalEnergies
  • Total chargers 2
  • GPS
    50.8576, 4.3580
Navigate now