Skip to main content
Ultra-fast175 kW Publicly Accessible 5 charge points

Charging station Reinakkerweg

9190 Stekene

Available connections

5x 175 kW
CCS
Ultra-fast Fast charging (DC)
Loading map...

About this location

Looking for a charging station in Stekene? At Reinakkerweg you'll find a public charging location with 5 available charge points. It's run by TotalEnergies. It's one of the 55 charging locations in Stekene. Its power (175 kW) is above the local average of 49 kW.

  • Postcode 9190 Stekene
  • Publicly accessible
  • Connectors: CCS (5x)

Charging at Reinakkerweg in Stekene

How long does charging take at Reinakkerweg?

At 175 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 16 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Reinakkerweg?

TotalEnergies sets the price. On a ultra-fast charger in Belgium you pay 0.65 to 0.95 euros per kWh on average. For 36 kWh that comes to roughly 23.40 to 34.20 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Reinakkerweg have?

Here you charge with CCS. CCS is a Type 2 plug with two extra pins for fast charging.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Stekene.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator TotalEnergies
  • Total chargers 5
  • GPS
    51.2270, 4.0632
Navigate now