Skip to main content
Standard120 kW Publicly Accessible 16 charge points

Charging station Industriepark Rosteyne 6

9060 Zelzate

Available connections

14x 22 kW
Type 2
Normal 3-phase (Fastest)
2x 120 kW
CCS
Fast Fast charging (DC)
Loading map...

About this location

Looking for a charging station in Zelzate? At Industriepark Rosteyne 6 you'll find a public charging location with 16 available charge points. It's run by Powerland. It's one of the 26 charging locations in Zelzate. Its power (120 kW) is above the local average of 53 kW.

  • Postcode 9060 Zelzate
  • Publicly accessible
  • Connectors: Type 2 (14x), CCS (2x)

Charging at Industriepark Rosteyne 6 in Zelzate

How long does charging take at Industriepark Rosteyne 6?

At 120 kW, an average electric car (60 kWh battery) charges here from 20 to 80 percent in about 24 minutes. That's fast charging. The car decides how fast it goes, and charging slows down after 80 percent. For your own car, work it out with the charging calculator.

What does charging cost at Industriepark Rosteyne 6?

Powerland sets the price. On a fast charger in Belgium you pay 0.55 to 0.85 euros per kWh on average. For 36 kWh that comes to roughly 19.80 to 30.60 euros. You'll see the exact rate in the app or on the charger. With a charging card, a small fee per session is sometimes added.

Which plug does the charging station at Industriepark Rosteyne 6 have?

Here you charge with Type 2, CCS. Type 2 is the standard plug for AC charging in Europe. CCS is a Type 2 plug with two extra pins for fast charging.

How do I pay at this charging station?

With a charging card, through the operator's app or, on newer fast chargers, simply with your bank card. See which charging card works out cheapest in our overview of charging cards.

Want to charge somewhere else nearby? See all charging stations in Zelzate.

Start route

Pick your navigation app and head straight there.

Estimate charging time

Work out how long you need to charge here

--
total charging time
Current 20%
Target 80%
* Including losses (~10%).

Location details

  • Operator Powerland
  • Total chargers 16
  • GPS
    51.1890, 3.8300
Navigate now